Mobirise

cam 

location Chelsea Art Museum, New York
client Chelsea Art Museum/ Miotte foundation
year planning 2010
with Alexander Stublic
technic LED tubes mounted infront of the facade

A layer of vertical LED-rods will be installed on  the façade of the Chelsea Art Museum, with a gap in between the building and the new structure. The LED structure will surpass the height of the building, to be in line with the taller buildings immediately surrounding the Museum. The material used for the new façade is extremely thin and it will appear as a transparent shell covering the building. The installation will feature abstract images 
moving across the building, at times even appearing to extend the structure of the Museum beyond its actual size. In this way, the projections will interact with the building’s façade, covering parts of it at times, but also allowing its original appearance to show through.
Mobirise
Mobirise
Mobirise
Mobirise

more projects